SEWER CAPPING FOR DEMOLITION & REBUILDS
Sewer Capping
Sewer Capping
Melbourne
Preparing a property for demolition or a knock-down rebuild? We carry out sewer capping and cut-and-seal work on existing sewer lines, with stormwater and water connection capping available where required for the project.
CAPPING FOR DEMOLITION & REBUILDS
Sewer Capping and Other Connections Before Demolition
When an existing building is being demolished or prepared for a rebuild, more than one service connection may need to be disconnected or capped. TM Plumbing & Maintenance can assess which connections are involved and what capping work is required before demolition proceeds.
BEFORE THE CAPPING WORK
What We Need Before We Cap the Sewer
Before sewer capping or related connection work is booked, it helps to know what is happening at the property and which services are involved. If the project also includes other sewer work, our sewer plumbers can help with those requirements too.
- Property address and project location
- Demolition or rebuild stage
- Sewer, stormwater or water connections involved
- Access to the existing service connections
- Available drainage or service plans
Don't Let Sewer Capping Hold Up Demolition
If your demolition date is approaching, organise the sewer, stormwater and water connection work early. We can check the existing services and determine what needs to be capped before the site moves to the next stage.
PLANNED AROUND THE EXISTING SERVICES
Sort the Sewer Capping Before Demolition Starts
Don’t leave the service connections until demolition day.
Whether the work is being arranged by the property owner, builder or demolisher, we check which sewer, stormwater and water connections are being disconnected, where they run and what needs to remain for the rebuild.
If inspection or water-authority requirements apply, they also need to be allowed for before the work is completed. We can review the existing services, scope the capping required and help get this part of the project sorted before demolition is due to begin.
FAQ
Answers to common questions
Sewer capping may be organised by the property owner, builder or demolition contractor depending on how the project is being managed. If the work is not included in the demolition scope, the sewer line capping can be arranged separately before demolition proceeds.
It depends on the existing services and what is being disconnected for the demolition or rebuild. We can check which connections are involved and whether sewer capping, stormwater capping or water connection capping needs to form part of the job.
The cost can vary depending on where the sewer connection is located, how easily the pipe can be accessed, the excavation required and whether other connections also need to be capped. We can scope the work once we know more about the property and demolition plans.
Arrange the work before demolition is due to begin so there is time to locate the sewer connection, organise access and account for any requirements that apply. If the existing sewer pipe needs to be capped and sealed, this should be sorted before the demolition works reach that part of the site.
Arrange the Sewer Cut & Seal Before Demolition
If demolition or a knock-down rebuild is coming up, organise the sewer cut and seal along with any stormwater or water connection work required for the site. We can assess the existing connections and help get the work sorted before demolition begins.